[00:00:02]

GOOD EVENING. WELCOME TO THE SPECIAL MEETING OF THE COUNCIL OF THE CORPORATION OF THE CITY OF ELLIOT LAKE,

[1. CALL TO ORDER]

DATED THURSDAY, JANUARY 30, 2025, 7 P.M.. CALL TO ORDER.

ROLL CALL. ALL MEMBERS ARE PRESENT. DECLARATIONS OF CONFLICT OF INTEREST.

[3. DECLARATIONS OF CONFLICT OF INTEREST]

ARE THERE ANY DECLARATIONS? COUNCILLOR MANN. THANK YOUR WORSHIP.

I'D LIKE TO DECLARE AN ITEM. REPORT 6.1 RELATING TO ELLIOT LAKE GAS TAX SUPPORT.

INDIRECT PECUNIARY INTEREST. AS MY EMPLOYER CURRENTLY HOLDS THE SPECIALIZED TRANSIT CONTRACT WITH THE MUNICIPALITY.

OKAY. THANK YOU. COUNCILLOR MANN ANY OTHER CONFLICTS TO DECLARE? GOING ONCE. TWICE. OKAY. PUBLIC INPUT SESSION THIS EVENING.

[4. PUBLIC INPUT SESSION]

WE HAVE ONE INPUT FROM MR. THOMAS WHO'S GOING TO SPEAK ON ITEM 6.2.

MR. THOMAS, PLEASE. THANK YOU, MR. MAYOR. MEMBERS OF COUNCIL, I'M MIKE THOMAS.

I'M HERE FOR 6.2. THIS IS REALLY BECOMING A CHALLENGING PIECE.

AND UPON REVIEWING THE REPORT THAT STAFF PUT FORWARD TONIGHT, I KEEP HEARING IN BETWEEN THE LINES TWO OVERARCHING THEMES IS LET'S BE PRUDENT AND LET'S BE CAUTIOUS. AND IT WAS A GREAT PIECE OF INFORMATION.

WHAT I WOULD SAY, AND I THINK WHAT THE PUBLIC COULD BE REASSURED ON IS BECAUSE, OF COURSE, AS MUCH AS YOU SAY YOU DON'T PAY ATTENTION TO SOCIAL MEDIA, IT'S THE CHATTER IS GETTING LOUDER AND THE FINANCIAL CONCERNS ARE GETTING GREATER.

SO WHAT I WOULD LIKE TO HEAR IT WOULD BE HELPFUL FOR THE COMMUNITY TO HEAR IS FOLLOWING THAT THEME OF CAUTION AND PRUDENCE. SHOULD WE NOT SPEND ANOTHER DIME OTHER THAN TO ENSURE THE INTEGRITY OF THE STRUCTURE UNTIL WE CAN GET POSITIVE CLARITY ON THE FUTURE FOR THE FOUNDATION, BECAUSE THAT'S REALLY THE WHOLE BALLGAME.

IF WE'RE SPENDING UPWARDS OF $11 MILLION FROM MONTHS AGO AND WE'RE TALKING ANOTHER 5 OR 600,000 TONIGHT, AND WITH THE OTHER ITEMS THAT ARE INVOLVED, IT'S MILLIONS OF DOLLARS BEFORE WE TAKE THAT NEXT STEP, IN LIGHT OF WHAT I READ THIS EVENING WITH THE THEMES OF CAUTION AND PRUDENCE, AND AS HARD AS YOU'VE WORKED AND AS CHALLENGING A DECISION IT IS, I THINK THE BEST COURSE OF ACTION WOULD BE LET'S NOT SPEND ANOTHER DIME OTHER THAN ON THE INTEGRITY OF THE STRUCTURE, UNTIL WE HAVE CONFIDENCE THAT WE HAVE SOMETHING WORTH BUILDING ON, AND THAT'S MY PUBLIC INPUT.

THANK YOU FOR YOUR TIME. OKAY. THANK YOU, MR. THOMAS. THERE ARE NO PUBLIC PRESENTATIONS THIS EVENING.

[6. REPORTS]

SIX REPORTS. 6.1 REPORT FROM THE SPECIAL PROJECTS MANAGER REGARDING ELLIOT LAKE TRANSIT GAS TAX SUPPORT.

MAY I HAVE A MOTION THAT COUNCIL AFFIRMS ITS LONG TERM COMMITMENT TO FUNDING TRANSIT SERVICES IN THE CITY OF ELLIOT LAKE? A MOVER COUNCILLOR FLINTOFF SECONDED. COUNCILLOR BULL.

MR. GOULDING, PLEASE. THANK YOU. THROUGH YOU, YOUR WORSHIP.

A FAIRLY PROCEDURAL REPORT IN FRONT OF YOU. THE MINISTRY OF TRANSPORT HAS BEEN IN TOUCH WITH STAFF AND ASKED THAT WE HAVE A RESOLUTION, AS IS RECOMMENDED IN THE REPORT ON THE BOOKS, IN ORDER TO DO A FAIRLY ROUTINE APPLICATION FOR ONTARIO GAS TAX SUPPORT TO SUPPORT OUR TRANSIT SYSTEM.

THIS IS SOMETHING THAT WE DO REGULARLY OVER THE LAST TWO YEARS.

THAT AMOUNT OF SUPPORT HAS TOTALED APPROXIMATELY $140,000.

IT'S BEEN ESCALATING AS THE YEARS PASSED. AND I'LL MAKE MYSELF AVAILABLE FOR ANY QUESTIONS.

IT'S REALLY STRAIGHTFORWARD. THIS ONE. OKAY. THANK YOU, MR. GOULDING. ANY QUESTIONS OR COMMENTS? COUNCILLOR MORRISSETTE.

THROUGH YOU, YOUR WORSHIP. THIS $140,000. HOW IS IT CALCULATED? IS IT BASED ON THE AMOUNT OF PEOPLE IN ELLIOT LAKE OR THE REVENUE IN GASES OR TAXES, OR THEY GO AND GRAB IT IN THE AIR AND GIVE IT TO US? THANK YOU. THROUGH YOU, YOUR WORSHIP.

FRANKLY, FROM MY PERSPECTIVE, IT SEEMS LIKE MORE OF THE LATTER.

I'M SURE THERE'S A MORE RIGOROUS CALCULATION THAT'S UNDERTAKEN, BUT I BELIEVE IT'S RELATED TO HOW MUCH GAS TAX IS COLLECTED ON A REGION BY REGION BASIS.

BUT PLEASE DON'T QUOTE ME ON ME ON THAT. THAT WOULD HAVE BEEN A MUCH BETTER QUESTION FOR OUR TREASURER.

[00:05:02]

AT ANY RATE, SORRY, IT HAS NOTHING TO DO WITH OUR APPLICATION.

ONTARIO TELLS US HOW MUCH THEY WILL GRANT US.

IT'S NOT A MATTER OF IF WE ASK NICER, WE'LL GET A BIGGER ALLOCATION.

OKAY. ANY OTHER QUESTIONS OR COMMENTS? PRETTY STRAIGHTFORWARD.

WE'RE JUST APPLYING AND HOPING TO GET AROUND $140,000.

OKAY. ALL IN FAVOR? THAT'S CARRIED.

OKAY. 6.2 REPORT FROM THE SPECIAL PROJECTS MANAGER REGARDING ROGERS ARENA PROJECT UPDATE.

WE HAVE A MOTION THAT COUNCIL APPROVES THE USE OF THE NEGOTIATION METHOD, AS DESCRIBED IN THE CITY'S PROCUREMENT POLICY TO SOLE SOURCE THE INSTALLATION OF WINTER SHORING FOR THE ARENA TO TIMBER RESTORATION SERVICES AT AN UPSET LIMIT OF $118,000 PLUS APPLICABLE TAXES, AND THAT COUNCIL APPROVED THE USE OF THE NEGOTIATION METHOD AS DESCRIBED IN THE CITY'S PROCUREMENT POLICY, TO SOLE SOURCE THE RENTAL OF SHORING EQUIPMENT FOR THE ARENA TO SKYWAY CANADA LIMITED AT AN UPSET LIMIT OF $120,000 PLUS APPLICABLE TAXES, AND THAT COUNCIL APPROVED THE USE OF THE NEGOTIATION METHOD AS DESCRIBED IN THE CITY'S PROCUREMENT POLICY.

SOLE SOURCE, THE PROVISION OF AN ELECTRICAL SERVICE CABINET AND RESURFACING WORK FOR THE ARENA TO KENNEDY ELECTRICAL AT AN UPSET LIMIT OF $75,000 PLUS APPLICABLE TAXES, AND THAT THESE FUNDS, SORRY THAT THE FUNDS REQUIRED TO SUPPORT THESE EXPENSES BE DRAWN FROM THE CITY'S BUILDING AND BUILDING AND FACILITIES RESERVE.

A MOVER COUNCILLOR SEIDEL SECONDED. COUNCILLOR MANN.

MR. GOULDING, PLEASE. THANK YOU. THROUGH YOU, YOUR WORSHIP.

THIS IS A FOLLOW UP REPORT TO THE ONE PROVIDED AT THE SPECIAL MEETING THAT WE HAD JUST BEFORE CHRISTMAS.

I'VE BROKEN IT DOWN LARGELY THE SAME WAY AS THE REPORT THAT WE SAW LAST TIME TO GIVE AN UPDATE ON THREE MAJOR INITIATIVES THAT ARE CURRENTLY BEING ADDRESSED AT THE ARENA. FIRSTLY, THE ROOF. THE FOUNDATION SYSTEM AND THE ELECTRICAL RESURFACING.

AS I DESCRIBED AT OUR LAST MEETING. WHILE THE SITUATION IS LARGELY THE SAME, THESE THREE INITIATIVES ARE INTERRELATED BECAUSE OF THE FACT THAT THEY ALL HAVE WORK THAT INTERSECTS AT A VERY.

JUST RIGHT OUTSIDE THE ICE PLANT WHERE THE HYDRO POLE IS SITUATED AT THE ARENA.

ALL OF THESE PHASES OF WORK HAVE TO BE DONE IN THAT LOCATION, IN THE BUILDING AT ONCE.

AND SO THEY'RE CONFLICTING WITH EACH OTHER IN DIFFERENT LOGISTICAL WAYS.

DURING OUR LAST MEETING, I BELIEVE IT WAS YOUR WORSHIP THAT MENTIONED THAT THERE WAS AN ISSUE WITH THE CONTRACTORS FOR THE ROOFING SYSTEM, DEMOBILIZING, AND THEN I INDICATED TO COUNCIL AT THAT TIME WE'D BE FOLLOWING UP.

I LAY OUT THE REASONS WHY IN THIS REPORT. THERE WAS SAFETY CONCERNS WITH WORK CONTINUING TO WORK ON THE ROOF.

I AGREE THAT THE STATE CONDITION OF THE ROOF WAS SUCH THAT JUST AS IT WAS AS WE'VE MITIGATED THAT THAT RISK. IT'S NOT SAFE TO WORK ON THE ROOF RIGHT NOW.

IT'S VERY SLIPPERY. AT THE TIME BEFORE CHRISTMAS, WE WERE MITIGATING THAT WITH HEATING THE STRUCTURE TO TRY AND PROMOTE SNOW MELT ON THE ROOF.

I THINK WE CAN ALL AGREE AT THIS POINT, AFTER THE SNOW THAT WE'VE HAD THIS PAST MONTH, THAT'S NOT A VERY EFFECTIVE STRATEGY.

HOWEVER, THERE'S PLENTY OF WAYS TO GET AROUND SAFETY CONCERNS.

WE CAN ADDRESS THEM AND MAKE SURE THAT WE PUT THE APPROPRIATE MEASURES IN PLACE TO MAKE A SAFE WORKPLACE.

HOWEVER, THAT COMES AT A COST, AND IT INVOLVES INCURRING EXPENSES AND ADDRESSING LOGISTICS.

IN THAT SPIRIT, I WENT BACK TO JOHNSON CONTROLS TO HAVE THEM ATTEMPT TO QUANTIFY WHAT IT WOULD TAKE IF WE WANTED TO PUSH THROUGH THE WINTER.

YOU KNOW, WHAT WOULD THAT LOOK LIKE IN TERMS OF EXPENSE AND LOGISTICS? THEY CAME UP WITH A PLAN AND WERE ABLE TO PUT A NUMBER TO IT.

[00:10:01]

AND LONG STORY SHORT, BECAUSE OF THE SITUATION WITH THE FOUNDATION, THE MICRO-PILES AND THE ELECTRICAL SERVICE IT'S STAFF'S OPINION THAT THAT'S REALLY NOT A RECOMMENDED SPEND AT THIS TIME TO PUSH THAT ONE PART OF WORK FORWARD WITHOUT HAVING A REAL IMPACT ON THE OVERALL SCHEDULE.

I THINK THAT STAFF'S IN AGREEMENT THAT THIS IS MONEY THAT WE WOULD RATHER PUT INTO THE STRUCTURE IN SOME WAY, SHAPE OR FORM. THE FOUNDATION SYSTEM. WE ARE STILL LOOKING AT THE MICRO-PILES SOLUTION. WE HAVE CONFIDENCE THAT IT'S GOING TO WORK.

WE HAVE HAD AN ISSUE WHERE THE VENDOR THAT'S BEEN CONTRACTED TO DO THAT INSTALLATION, THERE'S A SCHEDULING CONFLICT, AND THEY WON'T BE BACK TO DO OUR WORK BEFORE MARCH.

SO, BECAUSE WE'RE NOT REALLY WILLING TO WAIT THAT LONG UNTIL WE FIND OUT WHETHER OR WHAT DEPTH WE NEED TO PUT THE MICRO-PILES TO HAVE ADEQUATE FOUNDING PRESSURE TO HOLD THE BUILDING UP.

WRD HAS COMMISSIONED EXP, ANOTHER ENGINEERING FIRM, TO COME AND DO TESTING ON THEIR OWN. SO THERE WILL BE A DRILL RIG SHOWING UP ON MONDAY TO DO THAT TESTING TO ENSURE THAT WE HAVE SUFFICIENT FOUNDING PRESSURE. WITH THAT, WE CAN CARRY ON FROM THE DISCUSSION PRIOR TO CHRISTMAS, WHERE WE, WHERE DOCTOR TINGLEY LAID OUT THAT WE CAN KNOW WHAT DEPTH WE NEED TO DRILL TO, TO HAVE SUFFICIENT FOUNDING PRESSURE SO THAT WE CAN HAVE A PROPER BUDGET FIGURE TO PUT TOWARDS, PUT FORWARD TO COUNCIL SO THAT THEY CAN CONSIDER IT.

BUT THE MAJOR POINT THERE IS THAT WE DON'T HAVE A VENDOR TO ACTUALLY AFFECT THE MICRO-PILE WORK UNTIL INTO MARCH.

SO PUSHING OTHER VENDORS FORWARD IN ANTICIPATION OF PUSHING THE OVERALL SCHEDULE TO GET THROUGH THE WINTER DOESN'T MAKE SENSE IF UNTIL WE'RE ABLE TO PUT A FOUNDATION SYSTEM IN AND SIMILARLY, LOGISTICS ISSUES THAT WE HAD ADDRESSED AT THE SPECIAL MEETING BEFORE THE HOLIDAYS.

THE ELECTRICAL CABINET DELIVERY IS EXPECTED AROUND THE SAME TIMELINE, AND WE HAVE A RECOMMENDED RESOLUTION BEFORE COUNCIL TO MOVE FORWARD WITH PROCURING THAT EQUIPMENT. STAFF HAS BEEN ATTEMPTING TO ENGAGE OTHER VENDORS TO TRY AND GET COMPETITIVE PRICING.

WE HAVEN'T HAD VENDORS COMING FORWARD TO SUPPLY US WITH THAT.

SO AT THIS POINT, WE WANT TO HOLD THAT TIMELINE.

IF EVERYTHING ELSE IS COMING TOGETHER AT MARCH IN MARCH, IT MAKES SENSE TO TO CARRY ON WITH THAT TIMELINE.

OKAY. THANK YOU, MR. GOULDING. QUESTIONS OR COMMENTS? COUNCILOR BULL. THANK YOU. YOUR WORSHIP THROUGH YOU TO MR. GOULDING. ON SOCIAL MEDIA, IT SHOWED THAT THE WORK HAS ALREADY BEEN DONE.

DID WE GET A PRICE BEFORE THAT? AND THIS IS JUST A REFLECTION OF WHAT WAS QUOTED.

THANK YOU. THROUGH YOU, YOUR WORSHIP. SO I'LL CLARIFY.

ALL OF THIS WORK HAS NOT BEEN DONE, BUT THE SHORING WORK HAS BEEN DONE AT THE ARENA.

STAFF HAD TO GIVE THE GO AHEAD TO TRS TO MOBILIZE, BECAUSE WE WERE REALLY CONCERNED ABOUT THE SNOW LOADS THAT WERE COMING, AND WE DIDN'T WANT TO LOSE A BUILDING OVER OUR INABILITY TO DEAL WITH THIS ADMINISTRATIVELY.

SO AT THE TIME OF WRITING THIS, THIS REPORT THE WORK HAD NOT BEEN COMPLETED, BUT WE WERE ANTICIPATING THAT IT WOULD BE SHORTLY.

I THINK IT ACTUALLY SAYS THAT IN ONE OF THE PARAGRAPHS, IF I RECALL CORRECTLY.

BUT AS WE SIT HERE NOW, TRS HAS COMPLETED THAT WORK AND DEMOBILIZED FOR A SHORT TIME IN ORDER TO TRY AND CONSERVE SOME DOLLARS.

THEY WERE ABLE TO GET THE WORK DONE MUCH FASTER THAN WHAT THIS RECOMMENDED AMOUNT REPRESENTS, BUT WE HAVEN'T BEEN PROVIDED WITH ACTUAL PRICING AS YET.

OKAY, I WAS JUST SORT OF CONCERNED THAT WE'RE DOING THE WORK WITHOUT GETTING PRICING.

SO I JUST WANTED TO MAKE SURE THAT WE'RE ON TOP OF WHAT WORK IS BEING DONE AND HOW MUCH WE'RE PAYING FOR IT.

[00:15:05]

THANK YOU. COUNCILLOR FLINTOFF. THANK YOU. YOUR WORSHIP THROUGH YOU TO MR. GOULDING. GOOD REPORT. VERY THOROUGH. A COUPLE OF QUESTIONS.

SO ON THIS, YOU'RE SAYING WHEN THE HEATERS ARE ON, WHEN YOU HAVE TO RUN THOSE HEATERS, IT COSTS BETWEEN 1000 AND 1500 PER DAY.

SO NOW THAT WE ARE NOT TRYING TO GET THE SNOW OFF THE ROOF, THE HEATERS ARE SHUT OFF.

THANK YOU. THROUGH YOU, YOUR WORSHIP. THAT'S CORRECT.

WE GOT THE THE SHORING IN PLACE. IT'S ABLE TO CARRY SNOW LOADS UP TO WHATEVER THE BUILDING CODE PRESCRIBES NOW.

AND WE DON'T NEED TO TRY AND MITIGATE OUR SNOW ACCUMULATION WITH HEATING THE BUILDING.

SO AT WHEN WE WERE IT WAS QUITE A COSTLY VENTURE.

WE WERE USING DI DIESEL FROM THE PUBLIC WORKS YARD AND WE WERE PUTTING IN BETWEEN 1000 AND 1200 LITERS OF DIESEL INTO THE HEATERS A DAY, WHICH IS A BIG EFFORT FOR STAFF, IF YOU CAN IMAGINE.

AND IT COMES AT GREAT EXPENSE. OKAY. AND A FOLLOW UP.

SO THE PORTION OF THE ROOF THAT'S NOT DONE, OBVIOUSLY THEY MUST BE COMFORTABLE WITH THE FACT.

WELL IT MUST BE SEMI-DONE FROM THE FIRST VENDOR.

SO IT'S NOT GOING TO LEAK, BECAUSE I KNOW WITH DOCTOR TINGLEY, YOU KNOW WATER IS THE BIG ENEMY.

THANK YOU. THROUGH YOU YOUR WORSHIP. SO I'M IN RECEIPT OF A LETTER FROM JOHNSON CONTROLS ACTUALLY FROM THEIR SUB VENDOR SAYING THAT THEY'LL CERTIFY THAT THE ROOF IS WATERTIGHT. THERE IS SOME CONCERN WITH SOME MINOR LEAKING THAT I'VE BEEN WITNESS TO.

BUT IT'S NOT NEARLY THE SCALE AND SCOPE OF WHAT WE'VE SEEN PREVIOUSLY IN THE BUILDING.

AND SO THERE IS A WATERPROOF BARRIER DOWN THAT IF THERE WASN'T SNOW RIGHT NOW, WE COULD LOOK AT.

AND IT'S PROVING TO BE EFFECTIVE. OKAY. THANK YOU.

CAN I GET ONE MORE? SHOULD I? OKAY. SURE. GO AHEAD.

SO JUST SO, FROM WHAT I UNDERSTAND, THE TESTING DRILLERS ARE BRAND NEW THAT ARE COMING HERE.

THEY'VE NEVER BEEN HERE BEFORE. SO THEY'RE GOING TO TEST THE SOIL.

THEN THEY'RE GOING TO SAY IT'S 44FT OR WHATEVER IT IS FOR US TO MAKE THIS.

BUT THEN THE ORIGINAL MICRO-PILE TEAM WILL BE COMING BACK IN MARCH ONCE.

SO DOCTOR TINGLEY IS CONFIDENT IN WHOEVER HE'S BRINGING IN TO DO THIS BECAUSE THE OTHER GUYS CAN'T MAKE IT.

IS THAT? THANK YOU. THROUGH YOU, YOUR WORSHIP.

THAT'S EXACTLY THE SITUATION. YES. SO THE DRILLERS THAT ARE COMING ARE DOING MORE THAN JUST DRILLING THE EARTH.

THEY'RE INSTALLING A MICRO-PILE, A MINI CAISSON, FILLING IT WITH CONCRETE, I UNDERSTAND, AND THEN DOING IT WHAT'S CALLED A PULL TEST, SO IT'S AN INTERESTING QUIRK OF PHYSICS THAT IF YOU PULL OUT A FOUNDATION ELEMENT, THE FORCE THAT YOU HAVE TO PULL WITH EQUALS THE AMOUNT OF PRESSURE THAT IT WILL SUPPORT.

SO THAT'S THE PROCESS THAT WE'LL BE GOING THROUGH.

OKAY. AND MY LAST QUESTION, SO I UNDERSTAND THAT WHY WOULD WE SPEND BETWEEN 350 TO $600,000.

IT TOTALLY MAKES SENSE WHAT YOU'RE SAYING BECAUSE IT DOESN'T MATTER. WE WOULDN'T BE OPEN UNTIL LATER ON ANYWAYS.

BUT WHILE EVERYTHING'S SITTING THERE IDLE, HAVE WE LOOKED AT THE BATHROOMS, THE LOBBY AND GETTING QUOTES AND ALL THAT STUFF? BECAUSE WE DON'T WANT TO HAVE EVERYTHING ELSE DONE, AND THEN IT'S END OF MAY AND THEN WE'RE JUST STARTING TO LOOK AT THAT.

THANK YOU. THROUGH YOU, YOUR WORSHIP. SO JUST TO CLARIFY.

LAST SPRING, WE SIGNED A PDA WITH JOHNSON CONTROLS TO DO A PROJECT AT THE ARENA, A DESIGN PROJECT AT THE ARENA THAT ENCOMPASSED THE VAST MAJORITY OF THE REMAINING SCOPE OF WORK AT THE ARENA.

THE INTENT WAS TO DO IT THIS SUMMER COMING. I KNOW THAT THEY'RE VERY CLOSE TO BEING ABLE TO PROVIDE COUNCIL WITH NOT ONLY CONSTRUCTION DOCUMENTS, BUT TO SATISFY THE PDA, BUT PART OF THAT PDA IS PROVIDING A PRICE FOR THE WORK AS WELL.

SO I'M CURRENTLY WORKING WITH JCI TO TIE UP THE LAST FEW SCOPE DETAILS ON THAT.

I DON'T THINK THAT THAT WILL BE COMPLETELY COMPREHENSIVE, BUT WILL BE THE VAST MAJORITY OF THE REMAINING WORK THAT WE NEED TO DO AT THE ARENA, INCLUDING AIR HANDLING, DEHUMIDIFICATION AND NEW SIDING.

OKAY. THANK YOU. ANY OTHER QUESTIONS? COUNCILLOR SEIDEL.

THANK YOU, YOUR WORSHIP MORE OF A COMMENT. YOU KNOW, UNDER.

THE THE ROOF, THE ROOFING CONTRACTOR, YOU KNOW, AT NO FAULT AT ALL TO ANY STAFF MEMBERS.

[00:20:06]

BUT, YOU KNOW, WE SAT HERE AND WE WERE TOLD BY THE ROOFING CONTRACTOR THAT THEY WERE COMING IN FOR 11 DAYS, GOING TO BREAK FOR 3 DAYS, COME BACK FOR 11 DAYS.

I LIVE IN THAT NEIGHBORHOOD AND MADE AN EFFORT TO DRIVE BY EVERY DAY WHEN ALL THE PRODUCT WAS THERE AND AND SAW 4 OR 5 DAYS WITH NOBODY ON THAT ROOF.

THAT'S WHAT WAS JUST DISAPPOINTING TO ME. SO BUT THAT'S JUST MORE OF MY COMMENT.

MR. GOULDING. THANK YOU. THROUGH YOU, YOUR WORSHIP.

COUNCILLOR SEIDEL. YOU'RE EXACTLY RIGHT. THERE WERE SEVERAL DAYS IN THEIR SCHEDULE THEY WEREN'T ABLE TO WORK, AND IT WAS DUE TO HEAVY FROST ON THE ROOF, SO THEY DEEMED IT UNSAFE TO WORK AT THAT TIME AS WELL.

IT'S FRUSTRATING TO SEE FROST BURN OFF TWO THIRDS OF THE WAY THROUGH THE DAY AND HAVE A THIRD OF A DAY AVAILABLE TO WORK ON, BUT DEMOBILIZING AND REMOBILIZING WORKMEN WITH OR PERSONNEL WITHOUT WITH THAT KIND OF EFFICIENCY, WAS JUST NOT WITHIN THE SCOPE OF WORK THAT WE AGREED UPON FOR THE CONTRACT.

SO IT THEY ALTHOUGH THERE WAS I DIDN'T COUNT THE DAYS.

THERE WERE SEVERAL DAYS THAT THEY WEREN'T ABLE TO REALIZE THEIR SCOPE OF WORK.

THEY DID EXTEND THEIR STAY TO TRY AND COMPLETE THE PROJECT.

AND THAT WAS THAT WAS AT THEIR EXPENSE. ANY OTHER QUESTIONS? COMMENTS? SO BASICALLY WHAT YOU'RE ASKING HERE IS TO JUST PAY FOR THE SHORING EQUIPMENT BASICALLY.

AND WE'RE GOING TO NAIL DOWN KENNEDY ELECTRICAL FOR THE ELECTRICAL WORK AND THE PANEL.

SO IN THE MEANTIME, WE COULD BE DOING THESE THINGS.

THE TOTAL COST OF DOING THE ROOF, THE HEATING, EVERYTHING TO GET IT DONE DURING THE WINTER, I CAN'T REMEMBER IF THERE WAS A QUOTE WAS LIKE BETWEEN 350 AND 600.

THANK YOU. THROUGH YOU, YOUR WORSHIP, THAT IT'S AN ESTIMATE.

SO UNDERSTANDABLY, THE VENDORS ARE RETICENT TO OFFER FIRM QUOTES WITH DEALING WITH WINTER WEATHER, SO WE'RE GETTING RANGES OF ESTIMATES. TRS HAS SUGGESTED THAT IT'S APPROXIMATELY $150,000 WORTH OF HEAT AND HOARDING THERE, BUT IT REALLY DEPENDS ON HOW YOU CUT IT UP, BECAUSE THERE'S HEATING.

THE STRUCTURE AS A WHOLE WOULD BE SOMETHING THAT THE CITY WOULD DO.

AND THEN WE'RE INTO OUR 1000 LITERS OF DIESEL A DAY.

AND SO I ATTEMPTED TO GIVE COUNCIL SOME INSIGHT WITH A RANGE OF WHAT IT WOULD BE, BECAUSE WE DON'T KNOW.

AND UNTIL WE SEE HOW THIS WINTER TURNS OUT. SO MOST OF OUR QUESTIONS WILL BE ANSWERED MARCH, END OF MARCH, APRIL WITH SOME ACTION AT THAT TIME.

ARE WE NAILING DOWN A TIMELINE FOR THE ROOFERS AT THIS TIME? BECAUSE POTENTIALLY THIS HEATING SYSTEM AT THE END OF THE WINTER.

IN THE SPRING. IT MIGHT BE ENOUGH TO GET RID OF ALL THE SNOW AND GET THEM GOING EARLY.

THOSE ARE OPTIONS THAT GO THROUGH MY HEAD WHEN I READ THIS.

I DON'T KNOW IF THAT'S WHAT WE'RE ENTERTAINING. THANK YOU, THROUGH YOU.

SO THE DEHUMIDIFICATION IN THE HVAC SYSTEM IS PRETTY EXTENSIVE.

IT'S NOT SUPPLEMENTARY TO WHAT'S THERE. IT'S A REPLACEMENT OF THE TWO SYSTEMS THAT WE HAVE THERE.

NOW, IN ORDER TO MAKE SURE THAT WE HAVE A PROPER RELATIVE HUMIDITY INSIDE THE STRUCTURE TO ALLOW FOR THE LONGEVITY OF THE WOOD STRUCTURE. AND WE HAD WRD PROVIDE JCI WITH, WITH DEFINITIVE SPECS ON HOW MUCH WHAT THE STATE CONDITION OF THE ATMOSPHERE INSIDE THE BUILDING NEEDED TO BE.

AND SO IT'S A SIGNIFICANT UPGRADE. SO IT WOULD TAKE TIME TO REALIZE THAT PROJECT.

SO THE IDEA THAT WE WOULD BE ABLE TO PUT THAT IN AND HAVE IT AFFECT OUR WINTER WEATHER IS NOT SOMETHING WE COULD REALIZE.

SO SHORT ANSWER TO THAT QUESTION IS NO, THAT'S NOT AN OPTION THAT'S OPEN TO US.

OKAY. SO BASICALLY THINGS ARE GOING ON HOLD. IS THERE ANYTHING MORE TO THE QUESTION?

[00:25:02]

I THINK WHAT COUNCILLOR FLINTOFF. IS THERE ANYTHING THAT CAN BE DONE IN THE ARENA FROM NOW UNTIL THOSE PROJECTS GET STARTED? THANK YOU, THROUGH YOU. BRANCH WIRING, ELECTRICAL WORK CAN CONTINUE.

BUT I DON'T KNOW THE STATE OF THE PROGRESS WITH THAT SCOPE OF WORK RIGHT NOW.

AND CONTINUED ARCHITECTURAL AND DESIGN WORK. AND DEALING WITH JCI ON THEIR SCOPE OF WORK CAN CONTINUE AND IS.

AND THEN, WELL I'M PUTTING YOU ON THE SPOT AGAIN.

SORRY. THERE'S NO WAY TO NAIL THEM DOWN TO A SCHEDULE.

CORRECT? UNTIL WE HAVE EVERYTHING TOGETHER. ARE THESE DELAYS GOING TO IMPACT OUR HOPEFUL TARGET FOR AUGUST 1ST? THANK YOU, THROUGH YOU I EXPECT THAT THEY WILL.

IT WOULD DEPEND ON WHEN OUR APPROVALS FOR THE ADDITIONAL SCOPE OF WORK WITH THE SIDING AND EVERYTHING ELSE, WHEN WE WERE ABLE TO GET A PRICE FOR THE COUNCIL WHEN THAT APPROVAL HAPPENED AND WHEN THE OTHER EXISTING SCOPE ITEMS ARE REALIZED ON SITE. SO IT'S NOT HELPING THE TIMELINE TAKING THIS WHAT'S GOING TO AMOUNT TO TWO AND A HALF MONTHS OFF.

BUT IT'S THE RECOMMENDATION THAT'S IN FRONT OF COUNCIL RIGHT NOW.

OKAY. THANK YOU. ANY OTHER QUESTIONS OR COMMENTS? COUNCILLOR SEIDEL. THANK YOU, YOUR WORSHIP THE COMPANY THAT'S COMING IN TO DO THE PULL TESTS.

IS THAT COVERED UNDER THE EXISTING CONTRACT WITH THE OTHER COMPANY, OR IS THERE A COST TO THAT? BECAUSE I DON'T SEE A COST OF THE PULL TEST IN YOUR REPORT.

THANK YOU, THROUGH YOU. I DON'T HAVE CLARITY RIGHT NOW ON HOW MUCH WRD IS LOOKING TO CHARGE US FOR THIS ADDITIONAL TESTING, OR IF THEY'RE DECIDING TO KEEP THAT UNDER THEIR, OUR EXISTING CONTRACT WITH US.

IT WOULD JUST BE SOMETHING. I WOULD LIKE TO KNOW.

SO THANK YOU THROUGH AGAIN, THROUGH YOU, YOUR WORSHIP.

I THINK THE MOST PRACTICAL THING TO EXPECT IS THAT THE ADDITIONAL PRICING THAT WE'LL RECEIVE TO SUPPLEMENT THE MICRO-PILE CONTRACT THAT WE HAVE WITH TRS RIGHT NOW WILL REFLECT THIS ADDITIONAL DESIGN WORK IN ONE WAY OR ANOTHER.

COUNCILLOR BULL. THANK YOU, YOUR WORSHIP, TO MR. GOULDING, I GUESS. ARE WE LOOKING AT GETTING EVERYTHING DONE THIS YEAR OR.

I THOUGHT WE WERE JUST GOING TO FOCUS ON THE ROOF AND THE SUPPORTS.

THE OUTSIDE, I DON'T THINK WOULD BE UNLESS THAT'S PART OF THE PROJECT, BUT I DON'T THINK THAT WOULD BE SOMETHING PRESSING.

OR IS IT PART OF THE JCI HEATING CONTROLS OR WHATEVER? THANK YOU. THROUGH YOU, YOUR WORSHIP. SO THE EASIEST WAY TO ANSWER THAT QUESTION IS IT'S OUR IT'S OUR BUILDING AND IT'S AT COUNCIL'S DISCRETION WHEN THEY WOULD LIKE TO DO ANY WORK THAT'S PUT IN FRONT OF THEM.

IT'S STAFF'S RECOMMENDATION THAT WE GET THE STRUCTURE TO A POINT WHERE IT'S STABLE AND STANDING ON ITS OWN, AND THEN MAKE GOOD DECISIONS ON WHAT THE SCHEDULE LOOKS LIKE GOING FORWARD AND WHAT WORK HAPPENS WHEN.

I THINK OUR DECISIONS WILL BE SWAYED BY EXPENSES, FOR SURE.

AND CASH FLOW. BUT THE SHORT ANSWER TO YOUR QUESTION IS THAT'S I BELIEVE THAT'S FOR COUNCIL TO DECIDE ONCE WE HAVE APPROPRIATE INFORMATION TO PRESENT TO YOU. THANK YOU. COUNCILLOR FLINTOFF. THROUGH YOU TO MR. GOULDING. WE HAVE TO REMEMBER THAT PART OF THE ROGERS THAT $3 MILLION, IT SPECIFIES THAT FOR INTERIOR WORK IN THE LOBBY, THE BATHROOMS, NOT FOR HUMIDIFIERS AND ALL THAT OTHER BIG, BIG DOLLAR STUFF.

SO MY POINT EARLIER IS, OKAY, I UNDERSTAND WE'RE RUNNING WITH JCI TO GET YOU A HANDLE ON ALL THE BIG DOLLAR STUFF, BUT WHAT'S STOPPING THIS? NOT SMALLER STUFF. WHAT'S STOPPING WITH A COMPANY NOW? OR DO WE HAVE TO WAIT FOR JCI TO COME AND SAY, WELL, THIS IS WHAT IT'S GOING TO TAKE TO DO THIS TO THE LOBBY AND JUST SOME OF THE STUFF.

SO WE HONOR OUR COMMITMENT TO THE ROGERS FOUNDATION.

THANK YOU. THROUGH YOU, YOUR WORSHIP. THE ONLY THING HOLDING US BACK ON THAT TYPE OF WORK IS ARCHITECTURAL DESIGN.

BECAUSE OF THE USE OF THE BUILDING, IT'S SUBJECT TO OVERSIGHT FROM AN ARCHITECTURE FIRM.

[00:30:04]

WE'RE HOPING TO HARMONIZE SOME OF THE SERVICES OF OUR VENDORS SO THAT WE DON'T HAVE TO ENGAGE YET ANOTHER PARTY TO PARTICIPATE IN THIS PROJECT. BUT TO SPECIFICALLY ANSWER SOME OF YOUR QUESTIONS.

THAT ISN'T INSIDE JOHNSON CONTROLS SCOPE OF WORK RIGHT NOW.

WE DON'T HAVE TO WAIT FOR THEM. THERE ARE THINGS THAT WE COULD DO IN THERE NOW.

THE IDEA THAT WE COULD HAVE THEM ORGANIZED AND PRICED AND READY TO GO WITHIN THE MONTH.

I DON'T THINK THAT THAT'S REALISTIC. BUT AT THE SAME TIME, THERE'S PLENTY OF OUTSIDE WORK THAT'S ON THE DOCKET THAT IS NOT IMPACTING THE INTERIOR FINISHES AT ALL.

SO WHILE WE'RE REALIZING FOUNDATION WORK, SIDING WORK, IF WE DECIDE MECHANICAL CHANGES, WE CAN BE WORKING IN THE LOBBY AND IN THE ENCLOSED AREAS OF THE ARENA CONCURRENTLY. SO MY RECOMMENDATION WOULD BE TO DO SOME PRUDENT PLANNING AND THEN HAVE THOSE SCOPE OF WORKS OVERLAP. OKAY. THANK YOU. OKAY. LAST ROUND.

ANY QUESTIONS OR COMMENTS? OKAY. WE'LL CALL THE VOTE.

ALL IN FAVOR? NONE OPPOSED. THAT'S CARRIED. THERE'S NO NOTICES OF MOTION.

THERE'S NO CLOSED SESSION BUSINESS. THERE ARE NO ADDENDUMS. THERE'S NO BYLAWS. NO CONFIRMATORY BYLAW. BYLAW 25-11 BEING A BYLAW TO CONFIRM THE PROCEEDINGS OF COUNCIL AT ITS

[11. CONFIRMATORY BY-LAW]

SPECIAL MEETING HELD ON THURSDAY, JANUARY 30TH, 2025.

WE HAVE A MOTION. PLEASE. I MEAN. WE HAVE A MOTION THAT BYLAW 25-11 BE PASSED. A MOVER. COUNCILLOR LEFEBVRE.

SECONDED. COUNCILLOR MANN. ALL IN FAVOR? THAT'S CARRIED.

ADJOURNMENT. MAY I HAVE A MOTION THAT THIS MEETING ADJOURNED AT THE HOUR OF 7:31 P.M.? MOVER COUNCILLOR MANN SECONDED. COUNCILLOR BULL.

ALL IN FAVOR? THAT'S CARRIED. THANK YOU.

* This transcript was compiled from uncorrected Closed Captioning.