**Due to technical difficulties portions of this item are without audio**
1. ROLL CALL
2. DECLARATION OF CONFLICT OF INTEREST
3. MINUTES OF THE PREVIOUS MEETINGS
3.1 Monday, January 16, 2017 2
4. PUBLIC PRESENTATION
5. INTRODUCTION AND CONSIDERATION OF CORPORATE REPORTS
5.1 Staff Report OPS 2017-03 Backwash Pumping System Rebuild 5
dated February 6, 2017
5.2 Staff Report OPS 2017-04 Engineering Services RFP Outcome 7
dated February 14, 2017
**Due to technical difficulties portions of this item are without audio**
1. ROLL CALL
2. DECLARATION OF CONFLICT OF INTEREST
3. MINUTES OF THE PREVIOUS MEETINGS
3.1 Monday, January 16, 2017 2
4. PUBLIC PRESENTATION
5. INTRODUCTION AND CONSIDERATION OF CORPORATE REPORTS
5.1 Staff Report OPS 2017-03 Backwash Pumping System Rebuild 5
dated February 6, 2017
5.2 Staff Report OPS 2017-04 Engineering Services RFP Outcome 7
dated February 14, 2017